TopGeo Energy Services Co., Ltd.
  中文 | English
Home>TGTech>Integrated Velocity Model Building with Floating Topography

Integrated Velocity Model Building Based on Floating Topography in Foothill Area:

1)Integrated Velocity Model Building and Depth Migration Techniques Based on Floating Datum

- First arrival tomography with multi-information constraint

- Noise attenuation in multi-domains

- Double square root NMO

- Floating Datum Velocity Analysis

- Complex velocity analysis in shallow washed-out area

2)Geological Steering Velocity Model Building in Depth Domain

- Make the full use of outcrops, well logs, VSP and structure models to constrain the velocity model

precision and reduce the multiplicity of velocity model building

- Improve the imaging precisions with data-driven and the fine geological interpretation

  • TopGeo Energy Services Co., Ltd.  
  • Address:BoTai International Building A709, Chaoyang District, Beijing, China  
  • Telephone:86-010-57048020  
  • Email:contact@topgeo.com.cn  
    Copyright  ©  2019-   All Rights Reserved.
  •   ICP:京ICP备19031179号-1